12139-015.1CSO-Brentwood & Red Bud Ave CSO Intercep(I-118)/Outfall (L-111) Eliminat. & Sewer Separat
The Contractor shall furnish all the materials, tools, equipment, labor to perform the construction of approximately 16,600 lineal feet of sanitary and storm pipe sewers, varying in size from 6” to 36” in diameter (including approximately 920 feet of 18” to 30” as pipe-in-tunnel), removal of inflow sources from 24 private properties, removal of one interceptor to eliminate a combined sewer overflow, and other associated work in accordance with all the requirements of these specifications, and the drawings made a part thereof.
Addendum 1
(click to expand/collapse)
Name | Size | ||
12139_Addendum1 | 6.2 MB |
Addendum 2
(click to expand/collapse)
Name | Size | ||
12139_Addendum2_20250128 | 3.2 MB |
Addendum 3
(click to expand/collapse)
Name | Size | ||
12139_Addendum 3 | 2.2 MB |