11255-015.1 Dellwood Creek Bank Stabilization - West Florissant To Hudson Rd.
Contract consists of the construction of approximately 725 lineal feet of natural channel stabilization, 350 lineal feet of modular block wall, 29 lineal feet of storm pipe sewers 12-inch to 24-inch in diameter, and appurtenances to be constructed.
Addendum 1
(click to expand/collapse)
Name | Size | ||
11255 ADDENDUM 1_2024_07_03_FINAL | 150.7 KB |
Addendum 2
(click to expand/collapse)
Name | Size | ||
ADDENDUM 2_2024_07_31 REV | 7.2 MB |
Addendum 3
(click to expand/collapse)
Name | Size | ||
11255 COMPLETE ADDENDUM 3 pdf | 630.0 KB |
Addendum 4
(click to expand/collapse)
Name | Size | ||
11255 ADDENDUM 4 w Attachments | 1.3 MB |