11820-013.3 LMRDP CSO Storage Tunnel (Broadway To RDP Tubes) (Macklind Demo)
The work to be done under this contract consists of the asbestos removal and demolition of the 1600 Macklind building, rubblization of the building floor, and proper disposal of demolished materials to be constructed.
Bid Documents
(click to expand/collapse)

Name | Size | ||
11820 Bid Form Contract Bond pdf | 470.0 KB | ||
11820 NTC w MWBE pdf | 634.7 KB | ||
11820 PN pdf | 80.1 KB |
Bid Summary, Bid Tab
(click to expand/collapse)

Name | Size | ||
11820 Bid Summary FINAL pdf | 611.6 KB | ||
11820 Bid Tab FINAL wo Est pdf | 133.2 KB | ||
11820 Premier Demo Bid Form | 229.5 KB | ||
11820 Premier Demo Good Faith | 207.3 KB | ||
11820 Spirtas Company Bid Form | 509.9 KB | ||
Notice of Award | 614.6 KB |
Plans
(click to expand/collapse)

Name | Size | |||
11820-013.3 Plans MACKLIND DEMO 2025-01-29 1 | 654.9 KB | |||
11820-013.3 Plans MACKLIND DEMO 2025-01-29 2 | 613.3 KB | |||
11820-013.3 Plans MACKLIND DEMO 2025-01-29 3 | 584.4 KB | |||
11820-013.3 Plans MACKLIND DEMO 2025-01-29 4 | 661.1 KB |
Prequalified Primes And Planholders
(click to expand/collapse)

Name | Size | ||
11820 Pre Qual Primes pdf | 120.2 KB |
Specs
(click to expand/collapse)

Name | Size | ||
11820 013 3 FULL COMPLETE SPECS | 4.4 MB |