13788-015.1 Hampton Hall 1525 Storm Sewer Repair (IR)
Contract consists of the construction of approximately 72 lineal feet of pipe sewers, varying in size from 15-inch to 21-inch in diameter, and appurtenances to be constructed.
Bid Documents
(click to expand/collapse)
Name | Size | ||
13788 Bid Form Contract Bond pdf | 447.5 KB | ||
13788 NTC w MWBE pdf | 580.4 KB | ||
13788 PN pdf | 74.3 KB |
Plans
(click to expand/collapse)
Name | Size | |||
13788-015.1 Plans-Hampton 1 | 165.5 KB | |||
13788-015.1 Plans-Hampton 2 | 276.1 KB | |||
13788-015.1 Plans-Hampton 3 | 262.3 KB |
Prequalified Primes And Planholders
(click to expand/collapse)
Name | Size | ||
13788 UP Pre Qual Primes pdf | 154.6 KB |
Specs
(click to expand/collapse)
Name | Size | ||
13788 FULL COMPLETE SPECS pdf | 11.3 MB |