11060-015.1 Dellwood Creek Streambank Stabilization (MCDW-15)

Contract consists of the construction of approximately 775 lineal feet of natural channel stabilization, 98 lineal feet of modular block wall, building demolition, 50 lineal feet of storm pipe sewers varying in size from 12-inch to 18-inch in diameter, and appurtenances to be constructed.
Addendum 1 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
11060 Addendum 1_2024_07_03_FINAL 150.9 KB
Addendum 2 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
11060 FULL COMPLETE ADD # 2 pdf 6.5 MB
Addendum 3 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
11060 FULL ADDENDUM #3 651.6 KB